Project photos for the conversion of the five-bed ensuite HMO at Bury Road, Bolton.

(only a few photos)

 

This project completed in January 2017.


HMO building materials

Rip-out starts

This property needed taking right back to the original lath and plaster in many places (notice the slats to the left of the picture).

HMO refurbishment

Rearranging exterior access

We blocked off the doorway shown in this photo as it became an en-suite which spanned the width of the room.

We opened up another doorway adjacent to it.

HMO damp proof course

Preparing for DPC

The walls have been stripped back to brick up to 1.2m to allow for a new damp proof course to be fitted, complete with 30 year guarantee.

HMO refurbishment St Helens

Removal of an old chimney

A horrible job, with 100+ years of soot!  Doing it opens up another couple square meters of floor space however.

HMO first fix electrics St. Helens

New Front Door fitted

HMO bathroom st helens

Finished kitchen

Complete with dressing items.

We lost a number of the photos for this project, hence the lack of walk-through progression that you will see on other projects.

HMO first fix electrics St. Helens

Additional dining area

 

We build a small dining area for the kitchen with an incorporated seat.

HMO first fix electrics St. Helens

Typical en-suite

Supplied with contemporary ‘square’ bathroom furniture.

HMO first fix electrics St. Helens

Shower cubicle

 

With upgraded tiles.

HMO first fix electrics St. Helens

Landing area

HMO first fix electrics St. Helens

Garden decking

 

 

HMO first fix electrics St. Helens

New fence and gate

Helps to maintain an overall professional look and feel to the property.